Skip to content
CoinCost
Home/Calculator

Crypto futures calculator

Calculate net PnL after entry and exit fees, funding fees, position size based on your stop loss, and fee rebates.

Enter your prices The initial entry uses a OP quote. The example exit is 3% higher. When you change the symbol, enter its prices too.

Rates are for standard perpetual futures taker orders. Enter your own fees for maker fills or account discounts.

Net PnL—
Return on margin
—
Position notional
—
Quantity
—
Gross price PnL
—
Round-trip fees
—
Break-even price
—
Est. liquidation (isolated)
—
Calculate funding fees too →

Turn a calculation into a trading record

Save P&L or position-size calculations as plans, then confirm actual fills and fees in your journal. Plans never enter your performance totals.

Open my journal →
Browse other tools

Futures PnL and fee formulas: a worked example

The BTC prices and fee rates below are assumptions for a worked example, not live prices or a specific exchange’s applicable rates. Enter your own conditions in the calculator above to compare.

  • Position notional = margin × leverage; quantity = notional ÷ entry price
  • Gross PnL: long = (exit − entry price) × quantity; short = (entry − exit price) × quantity
  • Round-trip fees = entry notional × entry fee rate ÷ 100 + exit notional × exit fee rate ÷ 100
  • Net PnL = gross PnL − round-trip fees; return on margin = net PnL ÷ margin × 100

Assumptions: 1,000 USDT margin, 10× leverage, long BTC at 50,000 USDT and exit at 52,000 USDT, with 0.05% fees at both entry and exit.

Results for the hypothetical long position
Entry notional / quantity10,000 USDT / 0.2 BTC
Gross PnL400 USDT
Entry / exit fees5 / 5.2 USDT
Round-trip fees10.2 USDT
Net PnL / return on margin389.8 USDT / 38.98%
Fee-adjusted break-even price (approx.)50,050.03 USDT

The exit notional and exit fee change with the exit price. This PnL example excludes funding fees and slippage.

For the final result, subtract actual funding paid from the net PnL above and add funding received. Record estimated rebates separately from confirmed PnL until their conditions and actual receipt are verified. The PnL calculator above does not automatically include accumulated funding.

Funding fee example

For a 10,000 USDT position at a +0.01% funding rate, a long pays 1 USDT per settlement. Assuming the same notional and rate for three settlements, the total is 3 USDT. A negative rate reverses the payment direction. Check the actual rate and settlement interval for the product and time.

Stop-loss position size example

For a 5,000 USDT account and a calculated loss budget of 1% (50 USDT), an entry at 50,000 and stop at 49,000 with 0.05% fees on both sides gives approximately 0.047642 BTC. Required margin at 10× leverage is approximately 238.21 USDT. Actual stop execution, slippage and funding can cause a loss above this budget.

Read the futures fee guide (Korean) · Current funding and liquidations · Compare entry, stop and targets on a chart

Calculation assumptions

Why do futures fees seem large relative to margin?

Fees apply to position notional (margin × leverage), not just margin. With 1,000 USDT at 10x leverage, both entry and exit fees are charged on a 10,000 USDT position.

Is the estimated liquidation price exact?

It is an isolated-margin approximation assuming zero maintenance margin. Exchange maintenance-margin requirements and fees generally bring the actual liquidation price closer to entry.

How is position size calculated from a stop loss?

The quantity is chosen so that the loss at the stop price, including the price difference and entry/exit fees, equals your chosen percentage of account balance.

자세한 예시: 선물 수수료는 왜 생각보다 클까?